One section of the corridor in Xendee's DESIGN software. The main connection terminal for the corridor runs north to south along the rail line. There is also a group of localized DER assets connected to the land_hv node to the East. This minimizes transmission losses by co-locating DER technologies with loads while also adding resilience along the corridor with the ability to transfer power in an emergency. (Credit: https://xendee.com/insights/protogen)
February 6, 2025